Test-strip production: materials to lot release

Test-strip production: materials to lot release

The design defines the process

There is no mandatory sequence for every strip. Geometry, reagents, materials and equipment define the route. A real project requires product documentation and a qualified process.

An illustrative eight-stage map

Adapt this outline to the actual design. Operations may be combined, reordered or performed by component suppliers.

  • Incoming material checks and preparation.
  • Substrate and conductor preparation.
  • Approved reagent preparation.
  • Reagent deposition.
  • Specified drying or stabilisation.
  • Alignment and assembly.
  • Separation and packaging.
  • Testing and lot-release decision.

Control between operations

Final inspection alone may not identify where an issue began. Define critical parameters, controls and records. Geometry, visual inspection and analytical testing answer different questions.

Packaging protects performance

Packaging and labelling must support the product’s stated conditions and shelf life. Lot identifiers connect products to records. Completing packaging is not itself a release decision.

Value for a partner

The map clarifies equipment scope, materials, controls and responsibilities. Evaluate capacity across the route, not only the fastest machine. Specific GDHFAD operations, parameters and capacity require project documentation.

Sources

  1. Nordson EFD: Production for Blood Glucose MetersPublished:
  2. FDA: Quality and Compliance (Medical Devices)Updated: